After lots of collaborative design meetings with landscape designers Culliton Quinn and many artists, including, Wesley Kimler, Mindy Schwartz (art teacher at Pritzker), Andrew Leicester and Dina Petrakis, and with the omnipresent Julie Dickinson steering the ship – the playground is going to be beautiful! The design is going to reflect the curriculum of the school and has involved the local arts community and will involve the kids in the school as well!
Our new play space is poured
Last modified on 2011-12-28 03:18:33 GMT. 0 comments. Top.
The majority of the work on our play space is done!! We took down the ratty ol’ fence, broke up the broken up concrete and poured some fresh stuff, added a sunken outdoor classroom and made some room for two large planting beds and a couple of new trees. The green stuff is coming in the spring, but the place looks really awesome already!
We will be updating with photos on our Facebook site and here…keep posted!
Playspace Renovation
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_dscn9726.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_playspace-4.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_playspace-1.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_pic-1.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_pic-2.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_pic-3.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_pic-4.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_green-stuff.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_img_0866.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_img_0883.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_img_0884.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_img_0887.jpg"]
[img alt="" src="http://www.friendsofpritzker.org/wp-content/flagallery/playspace-renovation/thumbs/thumbs_img_0888.jpg"]
Play Space: Final Design
Last modified on 2011-10-31 01:59:05 GMT. 0 comments. Top.
FOP and its design and construction team is excited to share its final design for Phase I of its renovation of pre-school and kindergarten play space. This project, the first part of a long-term multi-phased master plan for the renovation, improvement and greening of the area on the southwest side of the school, will include the removal of interior perimeter fencing; removal of existing dead tree; demolition of existing wooden play structures and decrepit asphalt play surface; grading of existing sub-base materials; installation of new storm drainage piping and collection structures; installation of new outdoor recessed teaching pavilion; installation of new concrete and asphalt patching; installation of new planting beds and grass play lawn; and the installation of new custom exterior benches and raised organic play dig zone.
Design of both the master plan and Phase I project has been graciously donated by the local landscape architecture firm Culliton Quinn. Brian Culliton and his family are residents of the neighborhood and his desire to design unique urban spaces, coupled with the vision and talents of his business partner, Tony Quinn, has been valued greatly by Friends of Pritzker.
Construction is anticipated to commence shortly!
